Portfolio

As a proven industry leader, we have successfully completed all types of industrial projects throughout the Southeast, consistently maintaining the highest standards of safety and quality in the field. Our team continually achieves excellent safety ratings that qualify our company to work on any type of industrial site. With each project, we discover new ways to become more efficient and cost-effective. Our broad experience preparing, constructing, and expanding large scale sites has earned us a reputation for delivering the highest quality of work within the established timeline. 

We have performed many projects in the industrial sector, including, but not limited to:

  • Data Centers
  • Distribution Warehouses
  • Power Generation Facilities
  • New Landfills
  • Existing Landfill Expansion
  • Landfill Closure
  • Military Base
  • Automotive Plants
  • Manufacturing Plants
  • Food and Beverage Plants
  • Pulp and Paper Mills

Amazon Huntsville

Size
110 Acres
Square Feet
1,050,000
Location
Huntsville, AL
Engineer
Kimley Horn
General Contractor
Gray Construction
Owner/Developer
Developer
Construction Manager
Owner
Amazon
  • 611,000 cubic yards of excavation
  • 775,764 square yards of fine grading
  • Cement stabilization for all site subgrade for building pads and paved areas
  • 25,000+ linear feet of storm sewer, roof drain, sanitary sewer and domestic water systems installed
  • 22,521 linear feet of curb and gutter poured and installed
  • All aggregate base and curb and gutter for paved areas and building pad furnished and installed
  • Developed a plan to repair 5 sinkholes that developed across the job with geotechnical engineer
  • Completed building pad ahead of schedule

Carvana Vehicle Inspection Center

Size
191 Acres
Square Feet
190,000
Location
Bessemer, AL
Engineer
Sain Associates
General Contractor
Catamount Constructors
Owner/Developer
Developer
Construction Manager
Owner
Carvana, LLC
  • 1,076,000 cubic yards of material, including 400,000 cubic yards of blasted rock moved
  • 100,000 cubic yards of material moved per week
  • 146,000+ tons of asphalt installed
  • 7,700 parking spaces created
  • Multiple concrete caps over existing wetland streams built
  • Completed building pad three weeks ahead of schedule

Lowe‘s Distribution Facility

Size
96 Acres
Square Feet
1,200,540
Location
Bessemer, AL
Engineer
EEFS, PC
General Contractor
Clayco
Owner/Developer
Developer
Construction Manager
Owner
CRG
  • 1,296,000 cubic yards of cut material, including 550,000 cubic yards of blasted rock
  • 600,000 square feet of soil cement installed in the building pad
  • 9,066 linear feet of storm sewer, 3,400 linear feet of sanitary sewer and 9,620 linear feet of water system Installed
  • 19,312 linear feet of curb and gutter poured
  • 30-acres of asphalt paving and 7-acres of site concrete paving installed
  • 100,000+ tons of aggregate base placed throughout the site
  • Completed building pad six weeks ahead of schedule

Mercedes Body Shop

Size
75 Acres
Square Feet
1,700,000
Location
Vance, AL
Engineer
Barge, Waggoner, Sumner and Cannon, Inc.
General Contractor
BL Harbert
Owner/Developer
Developer
Construction Manager
Owner
Mercedes-Benz
  • 2,350,000 cubic yards of excavation
  • 1,115,000+ cubic yards of waste material hauled to a 30-acre waste site
  • 55-foot-tall x 3,500-foot-long soil nail wall installed for slope stabilization
  • Completed work in 176 working days, a full month ahead of schedule

Our residential projects lay the ground work for communities that will shape the lives of families for generations. Our grading operations work with our sanitary sewer, storm sewer, and water utility crews in order to deliver a complete project to the developer. Along with the robust resources required for large residential developments, we have a staff of expert project managers, site superintendents, and operators that quickly mobilize to jobsites to address the most demanding schedules and make the most efficient use of the land. To date, our company has completed more than 50 residential projects, delivering ready-to-build lots on time and within budget.

Grand River Townhomes

Size
25 Acres
Square Feet
Location
Leeds, AL
Engineer
Schoel Engineering
General Contractor
Owner/Developer
Newcastle Homes
Developer
Construction Manager
Owner
  • New townhome development
  • Mass earthwork, storm, sewer, water, gutter, curb and paving included
  • Completed within erosion control area of Cahaba River watershed

Grants Mill Phases I, II, & III

Size
92 Acres
Square Feet
Location
Irondale, AL
Engineer
Carr and Associates
General Contractor
Owner/Developer
Tower Homes
Developer
Construction Manager
Owner
  • Multi-year project for residential and multi-family development
  • 350,000+ cubic yards of excavation and compaction
  • All storm/sewer/water/curb/paving installation
  • 300+ lots and pads for housing

Hopewell Crossings Phase I

Size
15 Acres
Square Feet
Location
Bessemer, AL
Engineer
ESP Associates AL, Inc
General Contractor
Owner/Developer
Habitat for Humanity Greater Birmingham
Developer
Construction Manager
Owner
  • Provided grading, pipe installation and other infrastructure improvements for 31 new home lots in a single-family subdivision
  • 26,400 cubic yards of material moved
  • 5,800 cubic yards of topsoil stripped for re-plate slopes stripped
  • 2,420 linear feet of sanitary sewer pipe installed
  • 1,300 linear feet of water main pipe
  • 1,230 linear feet of storm sewer pipe
  • 33,700+ square yards fine graded for home sites and roadways
  • 2,719 linear feet of curb and gutter installed

The Bray

Size
47 Acres
Square Feet
Location
Vestavia, AL
Engineer
Schoel Engineering
General Contractor
Owner/Developer
Developer
Liberty Park Joint Venture
Construction Manager
Owner
Liberty Park Joint Venture
  • Mass grading for Liberty Park future development
  • 600,000+ cubic yards of excavation
  • 16,000+ linear feet of pipe installed
  • Curb and paving included

As a full-service, turn-key site work contractor, our company can assume the role of a general site contractor. Our team is uniquely equipped to prepare commercial sites up to the point of building the vertical structure. Beginning with erosion control and grading through completion of infrastructure, we have successfully delivered hundreds of the highest quality commercial properties within the required project schedule. Throughout every phase of commercial projects, we hold ourselves accountable to the businesses and the employees who will eventually work on the land we shape. Many of our projects have been nationally recognized for excellence in construction.

We have performed many projects in the commercial sector, including, but not limited to:

  • Automotive Dealerships
  • Shopping Malls
  • Office Buildings and Complexes
  • Church Campuses
  • School Campuses
  • Health Care Facilities
  • Apartment Complexes
  • Hotels
  • Restaurants
  • Community Parks
  • Athletic Fields and Facilities

Church of the Highlands – Grants Mill

Size
125 Acres
Square Feet
Location
Irondale, AL
Engineer
South and Associates
General Contractor
Brice Building Company
Owner/Developer
Developer
Construction Manager
Owner
Church of the Highlands
  • 485,000 cubic yards of mass rock blasting
  • 175,000 cubic yards of mass excavation and grading
  • 90,000 square yards of paved parking and access roads
  • Work adjacent to a federally protected waterway
  • Successfully handled high concentrations of site water runoff due to large, exposed areas and severe topography
  • Successfully navigated around existing underground mines throughout the site
  • Overcame challenges due to extreme variations of soil types and rock strata formations
  • Made improvements to the right of way of two existing roadways

Protective Stadium

Size
16 Acres
Square Feet
Location
Birmingham, AL
Engineer
Schoel Engineering
General Contractor
Owner/Developer
Developer
Construction Manager
BL Harbert
Owner
Birmingham-Jefferson Civic Center Authority
  • 4 city blocks of roadways, walls, staircases, fencing, gates, light poles, concrete curb and gutter, asphalt and dense graded base milled and removed
  • 2+ miles of existing utilities, storm sewer, manholes and structures demolished
  • 158,000 cubic yards of cut to fill materials moved
  • Approx. 8,000 triaxle dump truck loads of off-site structural fill dirt for grade elevation
  • 16+ acres of grading, fine grading, subgrade preparation, demolition, erosion control in downtown
  • Numerous unknown utilities relocated, abandoned and re-routed
  • Numerous unknown storm sewer lines addressed to re-route, handle, contain and treat storm water

The Marketplace at The Bray

Size
15 Acres
Square Feet
Location
Vestavia, AL
Engineer
Schoel Engineering
General Contractor
Owner/Developer
Developer
Liberty Park Joint Venture
Construction Manager
Owner
LP Development
  • 210,000 cubic yards cut to fill material moved
  • 65,000 cubic yards mass rock excavated
  • Intensive erosion control installed adjacent to Cahaba River/Lake Purdy watershed
  • Two temporary ponds and countless linear feet of required diversion ditches and material management
  • 55+ storm inlets,
  • Over a mile of storm sewer with multiple temporary and permanent water quality structures utilized and installed
  • All site sanitary/water system, power/telephone duct bank, utility crossings/sleeves, sidewalk, hardscape, lighting, project signage, landscape/irrigation installation
  • 7+ acres of asphalt paving with multiple paving sections and base requirements installed

We are honored to partner with governmental clients on projects that require a special level of trust and confidentiality. Our work on these projects establishes an enduring foundation for facilities that provide vital services.

Eglin AFB F-35 Training Facility – 2008/2009

Size
Square Feet
Location
Ft. Walton Beach, FL
Engineer
US Army COE
General Contractor
Owner/Developer
Developer
Construction Manager
Owner
US Navy
  • Construction of a training facility for the developing F-35 airpower

Fort Benning WIT Barracks – 2008/2009

Size
Square Feet
Location
Columbus, GA
Engineer
US Army COE
General Contractor
Owner/Developer
Developer
Construction Manager
Owner
US Army
  • New facility for wounded transitioning soldiers

Fort Jackson Barracks – 2008/2009

Size
Square Feet
Location
Columbia, SC
Engineer
US Army COE
General Contractor
Owner/Developer
Developer
Construction Manager
Owner
US Army
  • Construction of new barracks facility for the US Army

Tyndall Marina and Recreational Facility

Size
Square Feet
Location
Panama City. FL
Engineer
US Army COE
General Contractor
Owner/Developer
Developer
Construction Manager
Owner
US Air Force
  • New facility for recreational use of base personnel

Tyndall WEG Subscale Drone Facility

Size
Square Feet
Location
Panama City. FL
Engineer
US Army COE
General Contractor
Owner/Developer
Developer
Construction Manager
Owner
US Air Force
  • New facility to support drone operations at Tyndall AFB

CS Beatty has experience in a wide range of mining activities, including but not limited to, tailings pond construction, overburden removal, quarry development, and product stockpile. Our team of estimators, engineers, and project managers will be involved from the beginning of the project to ensure the client’s needs are achieved. With a large fleet of equipment, our team can provide a safe and successful project on time and within budget.

ACME Brick Birmingham

Size
100,000 CY Clay Stockpiled
Square Feet
Location
Birmingham, AL
Engineer
General Contractor
Owner/Developer
Developer
Construction Manager
Owner
ACME Brick

ACME Brick Montgomery

Size
50,000 CY Clay Stockpiled
Square Feet
Location
Montgomery, AL
Engineer
General Contractor
Owner/Developer
Developer
Construction Manager
Owner
ACME Brick

Pottsville Quarry

Size
100,000 CY Quarry Overburn Removed
Square Feet
Location
Pottsville, TN
Engineer
General Contractor
Owner/Developer
Developer
Construction Manager
Owner
Rogers Group

Vance Quarry

Size
275,000 CY Quarry Overburden Removed
Square Feet
Location
Vance, AL
Engineer
General Contractor
Owner/Developer
Developer
Construction Manager
Owner
Martin Marietta